{"id":181517,"date":"2026-10-22T09:44:13","date_gmt":"2026-10-22T07:44:13","guid":{"rendered":"https:\/\/alzira.es\/?p=181517"},"modified":"2026-10-22T09:44:15","modified_gmt":"2026-10-22T07:44:15","slug":"sanitat-adquirix-els-terrenys-per-a-ampliar-el-parquing-de-lhospital-de-la-ribera-despres-de-culminar-lexpropiacio","status":"publish","type":"post","link":"https:\/\/alzira.es\/es\/sanitat-adquirix-els-terrenys-per-a-ampliar-el-parquing-de-lhospital-de-la-ribera-despres-de-culminar-lexpropiacio\/","title":{"rendered":"Sanitat adquirix els terrenys per a ampliar el p\u00e0rquing de l&#8217;Hospital de la Ribera despr\u00e9s de culminar l&#8217;expropiaci\u00f3"},"content":{"rendered":"\n\n\n<p class=\"wp-block-paragraph\">\u00b7 L&#8217;acte d&#8217;al\u00e7ament de les actes d&#8217;ocupaci\u00f3 i pagament dels terrenys de 32.850 m\u00b2 s&#8217;ha celebrat este mat\u00ed a l&#8217;Ajuntament d&#8217;Alzira<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00b7 La formalitzaci\u00f3 d&#8217;este tr\u00e0mit suposa un pas decisiu per a avan\u00e7ar en el projecte, ja que permet a la Conselleria disposar del s\u00f2l necessari per a continuar amb el seu desenrotllament<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Alzira (21.10.26). La La Conselleria de Sanitat ha adquirit el dret a ocupar els 32.820 metres quadrats de s\u00f2l necessaris per a ampliar l&#8217;aparcament de l&#8217;Hospital Universitari de La Ribera, despr\u00e9s de la celebraci\u00f3 este mat\u00ed, a l&#8217;Ajuntament d&#8217;Alzira, de l&#8217;acte d&#8217;al\u00e7ament de les actes d&#8217;ocupaci\u00f3 i pagament dels terrenys als propietaris.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La formalitzaci\u00f3 d&#8217;este tr\u00e0mit suposa un pas decisiu per a avan\u00e7ar en el projecte, ja que permet a la Conselleria disposar del s\u00f2l necessari per a continuar amb el seu desenrotllament.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En este sentit, l&#8217;Ajuntament d&#8217;Alzira actua com a administraci\u00f3 expropiant, mentres que la Conselleria de Sanitat, a trav\u00e9s de la Direcci\u00f3 General de Gesti\u00f3 Econ\u00f2mica, Contractaci\u00f3 i Infraestructures, \u00e9s la benefici\u00e0ria de l&#8217;expropiaci\u00f3 i assumix el cost dels terrenys.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En este sentit, els 32.820 metres quadrats de s\u00f2l no urbanitzable es destinaran a l&#8217;ampliaci\u00f3 de l&#8217;aparcament i a altres infraestructures complement\u00e0ries vinculades al recinte hospitalari.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&#8217;ampliaci\u00f3 de l&#8217;aparcament respon a una reivindicaci\u00f3 hist\u00f2rica d&#8217;usuaris i professionals de l&#8217;hospital i busca donar resposta a les necessitats derivades del creixement demogr\u00e0fic de la comarca i de l&#8217;augment sostingut de la demanda assistencial.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aix\u00ed, l&#8217;actuaci\u00f3 pret\u00e9n millorar l&#8217;accessibilitat al centre sanitari, facilitar l&#8217;estacionament i contribuir a reduir la congesti\u00f3 de vehicles en el seu entorn, afavorint la mobilitat de pacients, acompanyants i professionals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pr\u00f2xims passos<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El procediment ha sigut possible gr\u00e0cies a la col\u00b7laboraci\u00f3 entre la Direcci\u00f3 General de Gesti\u00f3 Econ\u00f2mica, Contractaci\u00f3 i Infraestructures de la Conselleria de Sanitat, l&#8217;Ajuntament d&#8217;Alzira i la Ger\u00e8ncia del Departament de Salut de La Ribera.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una vegada formalitzat el dret d&#8217;ocupaci\u00f3 dels terrenys, el seg\u00fcent pas ser\u00e0 la licitaci\u00f3 de la redacci\u00f3 del projecte constructiu i de la direcci\u00f3 d&#8217;obra. Esta fase permetr\u00e0 definir les caracter\u00edstiques t\u00e8cniques de l&#8217;ampliaci\u00f3 i les infraestructures associades. Posteriorment, es tramitar\u00e0 la licitaci\u00f3 de les obres.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1430\" height=\"1072\" src=\"https:\/\/alzira.es\/wp-content\/uploads\/2026\/10\/Foto-1-1430x1072.jpeg\" alt=\"\" class=\"wp-image-181518\" srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2026\/10\/Foto-1-1430x1072.jpeg 1430w, https:\/\/alzira.es\/wp-content\/uploads\/2026\/10\/Foto-1-680x510.jpeg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2026\/10\/Foto-1-768x576.jpeg 768w, https:\/\/alzira.es\/wp-content\/uploads\/2026\/10\/Foto-1-1536x1152.jpeg 1536w, https:\/\/alzira.es\/wp-content\/uploads\/2026\/10\/Foto-1.jpeg 1600w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>\u00b7 L&#8217;acte d&#8217;al\u00e7ament de les actes d&#8217;ocupaci\u00f3 i pagament dels terrenys de 32.850 m\u00b2 s&#8217;ha celebrat este mat\u00ed a l&#8217;Ajuntament d&#8217;Alzira \u00b7 La formalitzaci\u00f3 d&#8217;este tr\u00e0mit suposa un pas decisiu per a avan\u00e7ar en el projecte, ja que permet a la Conselleria disposar del s\u00f2l necessari per a continuar amb el seu desenrotllament Alzira (21.10.26). &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/alzira.es\/es\/sanitat-adquirix-els-terrenys-per-a-ampliar-el-parquing-de-lhospital-de-la-ribera-despres-de-culminar-lexpropiacio\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abSanitat adquirix els terrenys per a ampliar el p\u00e0rquing de l&#8217;Hospital de la Ribera despr\u00e9s de culminar l&#8217;expropiaci\u00f3\u00bb<\/span><\/a><\/p>\n","protected":false},"author":36,"featured_media":181518,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1861],"tags":[],"class_list":["post-181517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-val-ajuntament-d-alzira"],"acf":[],"_links":{"self":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/181517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/comments?post=181517"}],"version-history":[{"count":0,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/181517\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media\/181518"}],"wp:attachment":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media?parent=181517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/categories?post=181517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/tags?post=181517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}