{"id":158529,"date":"2025-02-21T09:04:36","date_gmt":"2025-02-21T08:04:36","guid":{"rendered":"https:\/\/alzira.es\/?p=158529"},"modified":"2025-02-21T09:04:38","modified_gmt":"2025-02-21T08:04:38","slug":"la-conselleria-aprova-lavantprojecte-del-nou-pont-de-xativa-i-dampliacio-del-barranc-de-casella-en-este-tram","status":"publish","type":"post","link":"https:\/\/alzira.es\/es\/la-conselleria-aprova-lavantprojecte-del-nou-pont-de-xativa-i-dampliacio-del-barranc-de-casella-en-este-tram\/","title":{"rendered":"La Conselleria aprova l\u2019avantprojecte del nou Pont de X\u00e0tiva i d\u2019ampliaci\u00f3 del Barranc de Casella en estE tram"},"content":{"rendered":"<p>La Conselleria d\u2019Agricultura ha comunicat a l\u2019Ajuntament d\u2019Alzira l\u2019aprovaci\u00f3 de l\u2019avantprojecte d\u2019AMPLIACI\u00d3 DEL BARRANC DE LA CASELLA PER A EVITAR INUNDACIONS EN EL NUCLI URB\u00c0 D&#8217;ALZIRA\u00a0 amb un pressupost base de licitaci\u00f3 (IVA incl\u00f2s) de 4.833.729,21 euros.<\/p>\n<p>L\u2019alcalde d\u2019Alzira Alfons Dom\u00ednguez, el regidor d\u2019Urbanisme, Andr\u00e9s Gomis i les arquitectes municipals junt a la Directora General de l\u2019Aigua, Sabina Goretti i el Cap del Servei d\u2019Infraestructures Hidr\u00e0uliques, Julio Mar\u00edn, es van reunir ahir per a avaluar l\u2019adequaci\u00f3 del Pont de X\u00e0tiva, per protegir la ciutat d\u2019Alzira davant del risc d\u2019inundacions, i pujar-lo a la cota de 21 metres sobre el nivell de la mar, com aconsellen els experts. \u201cEvidentment, si abans eren importants aquests tipus d\u2019obres, ara s\u00f3n indispensables, donat que som tots conscients de les noves necessitats\u201d, ha explicat l\u2019alcalde.<\/p>\n<p>La proposta presentada per la Direcci\u00f3 General presenta el disseny d\u2019un nou pont, despla\u00e7at a cent metres de l\u2019antic empla\u00e7ament, tal i com s\u2019havia acordat amb l\u2019Ajuntament, els ve\u00efns i empreses afectades.<\/p>\n<p>A m\u00e9s es contempla l\u2019eliminaci\u00f3 de l\u2019antic pont despr\u00e9s de la finalitzaci\u00f3 de l\u2019obra del nou per tal que no es puga afectar el tr\u00e0nsit al Pol\u00edgon Industrial i a les vivendes, tal i com s\u2019havia acordat.<\/p>\n<p>El cost principal de l\u2019obra ser\u00e0 cobert pel pressupost de 5 M\u20ac que el Ministeri de Transici\u00f3 Ecol\u00f2gica va transferir a la Direcci\u00f3 General amb esta finalitat. Per la seua banda, l\u2019Ajuntament assumir\u00e0 l\u2019expropiaci\u00f3 dels terrenys necessaris per a l\u2019execuci\u00f3 adequada en temps i forma de les obres.<\/p>\n<p>L\u2019avantprojecte assumeix l\u2019alternativa acordada entre la Generalitat, l\u2019Ajuntament d\u2019Alzira i l\u2019Ajuntament de Carcaixent, la qual s\u2019executar\u00e0 en dues fases. En la primera fase, que \u00e9s la que incorpora l\u2019avantprojecte, no s\u2019inclou la passarel\u00b7la de pas ciclopeatonal per comunicar el barri de Materna amb el barri de les Basses, ja que esta es dissenyar\u00e0 sota el consens entre l\u2019Ajuntament, la Direcci\u00f3 General i la Confederaci\u00f3 Hidrogr\u00e0fica del X\u00faquer. Tampoc est\u00e0 plasmada en la primera fase la rodona de connexi\u00f3 del pont amb l\u2019Avinguda de Carcaixent, com a entrada al barri i l\u2019\u00e0rea industrial de Materna. L\u2019objectiu de l\u2019Ajuntament \u00e9s executar esta segona fase a trav\u00e9s de les subvencions d\u2019IVACE per a millora de les \u00e0rees industrials, tal i com es va acordar en una reuni\u00f3 de coordinaci\u00f3 amb IVACE.<\/p>\n<p>\u201cEl punt m\u00e9s important a tindre en compte seria la necess\u00e0ria coordinaci\u00f3 entre les entitats que intervenen per tal que tot all\u00f2 acordat per tindre esta obra\u00a0 de protecci\u00f3 enfront al risc d\u2019inundacions siga realitat\u201d, ha afegit l\u2019alcalde.<\/p>\n<p>Esta actuaci\u00f3 \u00e9s finan\u00e7ada amb Fons del Pla de Recuperaci\u00f3, Transformaci\u00f3 I Resili\u00e8ncia, pr\u00e8via conformitat del Ple Municipal amb l&#8217;avantprojecte aprovat, sol\u00b7licitud a la Conselleria d&#8217;Agricultura, Aigua, Ramaderia i Pesca perqu\u00e8 execute les obres i comprom\u00eds per part de l&#8217;Ajuntament d&#8217;aportar els terrenys necessaris per a l&#8217;execuci\u00f3 de les obres.<\/p>\n<p>Per la seua banda des de l\u2019Ajuntament s\u2019ha iniciat la convocat\u00f2ria a l\u2019Associaci\u00f3 de Ve\u00efns de les Basses, els ve\u00efns i l\u2019EGM Materna, per a traslladar la situaci\u00f3 del projecte.<\/p>\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1430\" height=\"1010\" src=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_1-1430x1010.jpg\" alt=\"\" class=\"wp-image-158530\" srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_1-1430x1010.jpg 1430w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_1-680x480.jpg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_1-768x542.jpg 768w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_1-1536x1084.jpg 1536w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_1-2048x1446.jpg 2048w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1430\" height=\"1011\" data-src=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_2-1430x1011.jpg\" alt=\"\" class=\"wp-image-158532 lazyload\" data-srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_2-1430x1011.jpg 1430w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_2-680x481.jpg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_2-768x543.jpg 768w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_2-1536x1086.jpg 1536w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/estat_final_fase_2-2048x1448.jpg 2048w\" data-sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 1430px; --smush-placeholder-aspect-ratio: 1430\/1011;\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>La Conselleria d\u2019Agricultura ha comunicat a l\u2019Ajuntament d\u2019Alzira l\u2019aprovaci\u00f3 de l\u2019avantprojecte d\u2019AMPLIACI\u00d3 DEL BARRANC DE LA CASELLA PER A EVITAR INUNDACIONS EN EL NUCLI URB\u00c0 D&#8217;ALZIRA\u00a0 amb un pressupost base de licitaci\u00f3 (IVA incl\u00f2s) de 4.833.729,21 euros. L\u2019alcalde d\u2019Alzira Alfons Dom\u00ednguez, el regidor d\u2019Urbanisme, Andr\u00e9s Gomis i les arquitectes municipals junt a la Directora General &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/alzira.es\/es\/la-conselleria-aprova-lavantprojecte-del-nou-pont-de-xativa-i-dampliacio-del-barranc-de-casella-en-este-tram\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abLa Conselleria aprova l\u2019avantprojecte del nou Pont de X\u00e0tiva i d\u2019ampliaci\u00f3 del Barranc de Casella en estE tram\u00bb<\/span><\/a><\/p>\n","protected":false},"author":36,"featured_media":158530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1632],"tags":[],"class_list":["post-158529","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-area-durbanisme-projectes-i-infraestructures"],"acf":[],"_links":{"self":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/158529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/comments?post=158529"}],"version-history":[{"count":1,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/158529\/revisions"}],"predecessor-version":[{"id":158534,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/158529\/revisions\/158534"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media\/158530"}],"wp:attachment":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media?parent=158529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/categories?post=158529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/tags?post=158529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}