{"id":158097,"date":"2025-02-05T10:23:00","date_gmt":"2025-02-05T09:23:00","guid":{"rendered":"https:\/\/alzira.es\/?p=158097"},"modified":"2025-02-06T12:25:28","modified_gmt":"2025-02-06T11:25:28","slug":"ajudes-en-materia-dinundabilitat-a-traves-daigues-de-valencia","status":"publish","type":"post","link":"https:\/\/alzira.es\/es\/ajudes-en-materia-dinundabilitat-a-traves-daigues-de-valencia\/","title":{"rendered":"Ajudes en mat\u00e8ria d\u2019inundabilitat a trav\u00e9s d\u2019Aig\u00fces de Val\u00e8ncia"},"content":{"rendered":"<p>El Ministeri de Transici\u00f3 Ecol\u00f2gica i Repte Demogr\u00e0fic arran les passades inundacions per motiu de la DANA, va adoptar mesures urgents per a l\u2019impuls del pla de resposta immediata, reconstrucci\u00f3 i rellan\u00e7ament davant els danys causats per la DANA en diferents municipis entre el 28 d\u2019octubre i el 4 de novembre de 2024.<\/p>\n<p>L\u2019Ajuntament d\u2019Alzira ha demanat subvencions mitjan\u00e7ant l\u2019empresa concession\u00e0ria Aig\u00fces de Valencia S.A per a reparar els danys a les diferents fases del cicle de l\u2019aigua urbana.<\/p>\n<p>El passat dijous 30 de gener els t\u00e8cnics del Ministeri de Transici\u00f3 Ecol\u00f2gica i Repte Demogr\u00e0fic junt al regidor d\u2019Obres i Infraestructures P\u00fabliques, Vicent De La Concepci\u00f3n, van visitar els diferents punts importants en el cicle de l\u2019aigua urbana a Alzira per comprovar de primera m\u00e0 els danys causats per la DANA.<\/p>\n<p>Al cicle del sanejament els danys majoritaris foren als col\u00b7lectors residuals, l\u2019obstrucci\u00f3 a imbornals domiciliaris i diferents danys estructurals per la necessitat de neteja i desembossament als que foren sotmesos. En esta l\u00ednia es va a realitzar una important inversi\u00f3 per garantir seguretat front a les possibles inundacions provocades pels efectes meteorol\u00f2gics adversos, a la zona Nord d\u2019Alzira.<\/p>\n<p>Amb una estimaci\u00f3 de m\u00e9s d\u20191.124.000\u20ac van a reparar-se i renovar-se tots els imbornals afectats i obstru\u00efts per causa de la DANA, per\u00f2 un dels elements m\u00e9s importants d\u2019esta ajuda ser\u00e0 la instal\u00b7laci\u00f3 de comportes anti-retorn a les eixides dels col\u00b7lectors pluvials al riu X\u00faquer. Estes comportes evitarien que l\u2019aigua de riu entrara pels imbornals a les diferents zones d\u2019Alzira quan no poden desaiguar al riu perqu\u00e8 el seu cabdal \u00e9s elevat.<\/p>\n<p>A la fase de depuraci\u00f3, \u00a0s\u2019ha demanat una ajuda per a les obres de condicionament i reparaci\u00f3 de l\u2019EDAR, situat prop de la ITV d\u2019Alzira, per un valor de 200.000\u20ac. Recordem que esta zona va patir danys en els equips electr\u00f2nics.<\/p>\n<p>Per \u00faltim, a la fase d\u2019abastiment la xarxa d\u2019aigua potable va patir fuites i causaren danys a equipaments electromec\u00e0nics i instrumentaci\u00f3. Esta ajuda, valorada en 218.000\u20ac, permetr\u00e0 reparar els equipaments, realitzar diferents an\u00e0lisis extraordinaris ordenats per l\u2019Autoritat Sanit\u00e0ria per la potabilitat de l\u2019aigua, fer una campanya de xoc per trobar les fuites de l\u2019aigua i finan\u00e7ar els treballs realitzats posteriorment als dies de la DANA que garantiren l\u2019aigua potable al municipi.<\/p>\n<p>\u00a0<\/p>\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"804\" height=\"1072\" src=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54-804x1072.jpeg\" alt=\"\" class=\"wp-image-158098\" srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54-804x1072.jpeg 804w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54-383x510.jpeg 383w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54-768x1024.jpeg 768w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54-300x400.jpeg 300w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54-1152x1536.jpeg 1152w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/02\/WhatsApp-Image-2025-02-04-at-17.47.54.jpeg 1200w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>El Ministeri de Transici\u00f3 Ecol\u00f2gica i Repte Demogr\u00e0fic arran les passades inundacions per motiu de la DANA, va adoptar mesures urgents per a l\u2019impuls del pla de resposta immediata, reconstrucci\u00f3 i rellan\u00e7ament davant els danys causats per la DANA en diferents municipis entre el 28 d\u2019octubre i el 4 de novembre de 2024. L\u2019Ajuntament d\u2019Alzira &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/alzira.es\/es\/ajudes-en-materia-dinundabilitat-a-traves-daigues-de-valencia\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abAjudes en mat\u00e8ria d\u2019inundabilitat a trav\u00e9s d\u2019Aig\u00fces de Val\u00e8ncia\u00bb<\/span><\/a><\/p>\n","protected":false},"author":36,"featured_media":158098,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1897],"tags":[],"class_list":["post-158097","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-serveis-publics"],"acf":[],"_links":{"self":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/158097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/comments?post=158097"}],"version-history":[{"count":1,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/158097\/revisions"}],"predecessor-version":[{"id":158100,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/158097\/revisions\/158100"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media\/158098"}],"wp:attachment":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media?parent=158097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/categories?post=158097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/tags?post=158097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}