{"id":157757,"date":"2025-01-22T14:08:02","date_gmt":"2025-01-22T13:08:02","guid":{"rendered":"https:\/\/alzira.es\/?p=157757"},"modified":"2025-01-22T14:08:04","modified_gmt":"2025-01-22T13:08:04","slug":"la-junta-de-govern-local-aprova-les-tres-actuacions-demergencia-de-reparacio-de-danys-de-zones-de-riu-i-barrancs-afectats-per-la-dana","status":"publish","type":"post","link":"https:\/\/alzira.es\/es\/la-junta-de-govern-local-aprova-les-tres-actuacions-demergencia-de-reparacio-de-danys-de-zones-de-riu-i-barrancs-afectats-per-la-dana\/","title":{"rendered":"La Junta de Govern Local aprova les tres actuacions d\u2019emerg\u00e8ncia de reparaci\u00f3 de danys de zones de riu i barrancs afectats per la DANA"},"content":{"rendered":"<p><strong>Vora 400.000 euros es destinaran a portar terme les reparacions<\/strong><\/p>\n<p><strong>Alzira, 22 de gener de 2025<\/strong>. La Junta de Govern Local, aprovava ahir l\u2019execuci\u00f3, per contracte d&#8217;emerg\u00e8ncia, de les obres de reparaci\u00f3 de danys ocasionats per la DANA,\u00a0 en llits urbans i periurbans a Alzira que portar\u00e0 a terme la Generalitat Valenciana.<\/p>\n<p>La Direcci\u00f3 General de l&#8217;Aigua ha realitzat una avaluaci\u00f3 preliminar de danys en llits urbans dels diferents municipis afectats, entre els quals es troba Alzira i ha desenvolupat tres propostes per a identificar i quantificar danys i portar a terme actuacions urgents per tal de restablir el correcte funcionament de les infraestructures.<\/p>\n<p>Estes actuacions es troben entre les llistades per l\u2019Ajuntament en l\u2018informe complet de danys patits arran de la DANA del passat 29 d\u2019octubre. Des de l\u2019Ajuntament s\u2019est\u00e0 gestionant la petici\u00f3 d\u2019ajudes a les diverses administracions per tal d\u2019anar assolint les obres de recuperaci\u00f3.<\/p>\n<p>Les tres actuacions que s\u2019emprendran des de la Direcci\u00f3 General d l\u2019Aigua es corresponen amb:<\/p>\n<p><strong>Canal Interceptor Fase 2; <\/strong><\/p>\n<p>La intervenci\u00f3 no preveu actuacions complement\u00e0ries ni millores, en canvi despr\u00e9s de comprovar el funcionament del canal s&#8217;evidencia que el tal\u00fas situat a l&#8217;est, al no comptar amb bri de protecci\u00f3, es descarna quasi \u00edntegrament. Aix\u00f2 \u00e9s degut a l&#8217;aigua d&#8217;arrossegament procedent dels camps confrontants. Encara que es van col\u00b7locar baixants la velocitat de l&#8217;aigua no va permetre la seua canalitzaci\u00f3 a l&#8217;interior del camp fins elles. Com a millora hauria de considerar-se l&#8217;execuci\u00f3 d&#8217;una cuneta de recollida d&#8217;aigua al capdavant de tal\u00fas per a la seua canalitzaci\u00f3 fins a les baixants.<\/p>\n<p>Valoraci\u00f3: 44.739 \u20ac<\/p>\n<p>Termini d\u2019execuci\u00f3 estimat: 1 mes<\/p>\n<p><strong>Riu X\u00faquer zona Recinte Firal i Ciutat Esportiva\u00a0 <\/strong>al seu pas pel nucli urb\u00e0<\/p>\n<p>Els danys se situen un poc m\u00e9s a l&#8217;esquerra de les coordenades indicades per la Direcci\u00f3 General. Durant la riuada, la canalitzaci\u00f3 del Rio X\u00faquer al seu pas pel cas urb\u00e0 d&#8217;Alzira ha ocasionat danys en les bermes aterrassades del marge esquerre del llit, en la zona de les instal\u00b7lacions esportives, emportant-se les terres que hi havia sobre la manta de geot\u00e8xtil i erosionant una part del cam\u00ed de ribera existent. Es proposa reparar els danys haguts.<\/p>\n<p>Valoraci\u00f3: 234.491,38<\/p>\n<p>Termini d\u2019execuci\u00f3 estimat: dos mesos<\/p>\n<p><strong>Barranc de l\u2019Alfarella al seu pas pel pol\u00edgon industrial El Pla.<\/strong><\/p>\n<p>Durant la riuada, s&#8217;han produ\u00eft danys en els talussos i els marges del Barranc S\u00e8quia de l\u2019Alfarella a l&#8217;interior del pol\u00edgon Industrial El Pla, afectant la pr\u00f2pia canalitzaci\u00f3, a les obres de pas sobre el mateix i a algunes voreres pr\u00f2ximes. La intervenci\u00f3 s&#8217;ajusta als danys ocasionats.<\/p>\n<p>Valoraci\u00f3: 96.862,32<\/p>\n<p>Termini d\u2019execuci\u00f3 estimat: 1 mes<\/p>\n<p>Totes les actuacions que afecten llits p\u00fablics hauran de coordinar-se amb la Confederaci\u00f3 Hidrogr\u00e0fica del X\u00faquer,\u00a0 amb la finalitat que no es produ\u00efsquen solapes amb altres actuacions promogudes per esta administraci\u00f3, sent necess\u00e0ria la seua autoritzaci\u00f3 per a poder executar estes obres.<\/p>\n<p>Una vegada estudiada la proposta de la Direcci\u00f3 General de l\u2019Aigua i Desenrotllament Rural, la Junta de Govern Local en la sessi\u00f3 d\u2019ahir 21 de gener, va decidir donar conformitat a les tres actuacions proposades per a la reparaci\u00f3 dels danys causats per la Dana a Alzira i va confirmar que cap altra administraci\u00f3 est\u00e0 duent a terme, o t\u00e9 previst executar les mateixes actuacions en este municipi. Per \u00faltim l l\u2019Ajuntament es compromet a col\u00b7laborar amb la Generalitat.<\/p>\n<p>\u00a0<\/p>\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"837\" height=\"560\" src=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-1.jpeg\" alt=\"\" class=\"wp-image-157758\" srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-1.jpeg 837w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-1-680x455.jpeg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-1-768x514.jpeg 768w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"841\" height=\"568\" data-src=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-2.jpeg\" alt=\"\" class=\"wp-image-157760 lazyload\" data-srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-2.jpeg 841w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-2-680x459.jpeg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-2-768x519.jpeg 768w\" data-sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 841px; --smush-placeholder-aspect-ratio: 841\/568;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"846\" height=\"570\" data-src=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-3.jpeg\" alt=\"\" class=\"wp-image-157762 lazyload\" data-srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-3.jpeg 846w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-3-680x458.jpeg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2025\/01\/actuacions_dg_aigua-3-768x517.jpeg 768w\" data-sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 846px; --smush-placeholder-aspect-ratio: 846\/570;\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Vora 400.000 euros es destinaran a portar terme les reparacions Alzira, 22 de gener de 2025. La Junta de Govern Local, aprovava ahir l\u2019execuci\u00f3, per contracte d&#8217;emerg\u00e8ncia, de les obres de reparaci\u00f3 de danys ocasionats per la DANA,\u00a0 en llits urbans i periurbans a Alzira que portar\u00e0 a terme la Generalitat Valenciana. La Direcci\u00f3 General &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/alzira.es\/es\/la-junta-de-govern-local-aprova-les-tres-actuacions-demergencia-de-reparacio-de-danys-de-zones-de-riu-i-barrancs-afectats-per-la-dana\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abLa Junta de Govern Local aprova les tres actuacions d\u2019emerg\u00e8ncia de reparaci\u00f3 de danys de zones de riu i barrancs afectats per la DANA\u00bb<\/span><\/a><\/p>\n","protected":false},"author":36,"featured_media":157758,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1632],"tags":[],"class_list":["post-157757","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-area-durbanisme-projectes-i-infraestructures"],"acf":[],"_links":{"self":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/157757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/comments?post=157757"}],"version-history":[{"count":1,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/157757\/revisions"}],"predecessor-version":[{"id":157764,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/157757\/revisions\/157764"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media\/157758"}],"wp:attachment":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media?parent=157757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/categories?post=157757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/tags?post=157757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}