{"id":153568,"date":"2024-08-26T13:56:04","date_gmt":"2024-08-26T11:56:04","guid":{"rendered":"https:\/\/alzira.es\/?p=153568"},"modified":"2024-08-26T13:56:08","modified_gmt":"2024-08-26T11:56:08","slug":"es-mamprenen-les-obres-a-la-muralla-dalzira","status":"publish","type":"post","link":"https:\/\/alzira.es\/es\/es-mamprenen-les-obres-a-la-muralla-dalzira\/","title":{"rendered":"Es mamprenen les obres a la muralla d\u2019Alzira"},"content":{"rendered":"<p>Hui \u00e9s un gran dia per a la hist\u00f2ria de la nostra ciutat, pel comen\u00e7ament dels treballs per a recuperar un tram de vora 100 metres del corredor de Ronda junt a la Muralla des del carrer Saludador fins la Casa Reial de Jaume I.<\/p>\n<p>Des d\u2019este mat\u00ed l\u2019empresa adjudicat\u00e0ria ha instal\u00b7lat les tanques de l&#8217;obra, per a protegir este B\u00e9 d\u2019Inter\u00e9s Cultural, i la resta d\u2019elements necessaris per a poder portar a terme les tasques amb la seguretat i protecci\u00f3 necess\u00e0ria.<\/p>\n<p>Recordem que es tracta d\u2019un total de 2.7 milions d\u2019euros amb dos parts, la Casa Reial i Rehabilitaci\u00f3 de la Muralla i pas de Ronda que comen\u00e7a ara. Les obres de la rehabilitaci\u00f3 tindran una durada de 6 mesos i tenen un cost de 349.554,48 \u20ac sufragats a trav\u00e9s del Plan Tur\u00edstic Nacional Xacobeo 2021-22.<\/p>\n<p>\u201cL\u2019inici de les obres \u00e9s un pas molt important perqu\u00e8 t\u00e9 a vore amb un projecte clau per al patrimoni hist\u00f2ric i cultural d\u2019Alzira i la connexi\u00f3 de la nostra ciutat amb la figura del Rei Jaume I\u201d, ha explicat el regidor d\u2019Urbanisme, Andr\u00e9s Gomis<\/p>\n<p>Per a executar el pas de Ronda, es realitzaran les seg\u00fcents intervencions: Demolici\u00f3 de tots el murs i parets mitgeres que es troben dins de la franja de dos metres respecte de l\u2019adarve, aix\u00ed com de la coberta de la nau existent en el carrer Santa Ll\u00facia, 31. S\u2019escarbaran els terrenys necessaris per a donar pendent al Pas de Ronda i finalment es dotar\u00e0 de enllumenat i drenatge.<\/p>\n<p>Recordem que estes obres arriben despr\u00e9s dels treballs arqueol\u00f2gics realitzats els \u00faltims mesos en que s\u2019han descobert restes de la torrassa o est\u00e0ncies en el solar de la torre Reial.<\/p>\n<p>S&#8217;han de practicar orificis tant a la torre primera i tercera, com al mateix mur, que s&#8217;han d&#8217;emplenar amb pedra picada per despr\u00e9s procedir al seu revestiment. Hi ha alguns merlets que han de ser reconstru\u00efts parcialment i d&#8217;altres totalment.<\/p>\n<p>A la torre primera, situada al costat del carrer Saludador, es demolir\u00e0 l&#8217;escala interior, les bigues i part del sostre que encara existeix, aix\u00ed com el parament de f\u00e0brica de blocs de formig\u00f3 i tots aquells elements impropis de la muralla i es posar\u00e0 un forjat de fusta.<\/p>\n<p>A la torre interm\u00e8dia (situada en l&#8217;immoble de Santa Ll\u00facia n\u00fam. 29, es demolir\u00e0 una escala realitzada de ma\u00f3 mass\u00eds que enlla\u00e7a la parcel\u00b7la existent amb la cara superior de l&#8217;adarve i la torre. Tamb\u00e9 s&#8217;eliminar\u00e0 el paviment de la torre i de l&#8217;adarve.<\/p>\n<p>A la tercera torre (situada a la parcel\u00b7la de la Casa Reial) s&#8217;executar\u00e0 un forjat de fusta i es col\u00b7locar\u00e0 un nou paviment a nivell de l&#8217;adarve.<\/p>\n<p>El projecte s&#8217;ha realitzat seguint els criteris i condicionants establits en l&#8217;autoritzaci\u00f3 de la Direcci\u00f3 General de Patrimoni Cultural, exp. 2023-0013-V i gr\u00e0cies al finan\u00e7ament dels Fons Europeus Next Generaltion.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1072\" height=\"1072\" src=\"https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-1072x1072.jpg\" alt=\"\" class=\"wp-image-153569\" srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-1072x1072.jpg 1072w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-510x510.jpg 510w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-350x350.jpg 350w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-768x768.jpg 768w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-300x300.jpg 300w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2-100x100.jpg 100w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/08\/muralla_alzira-2.jpg 1528w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Hui \u00e9s un gran dia per a la hist\u00f2ria de la nostra ciutat, pel comen\u00e7ament dels treballs per a recuperar un tram de vora 100 metres del corredor de Ronda junt a la Muralla des del carrer Saludador fins la Casa Reial de Jaume I. Des d\u2019este mat\u00ed l\u2019empresa adjudicat\u00e0ria ha instal\u00b7lat les tanques de &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/alzira.es\/es\/es-mamprenen-les-obres-a-la-muralla-dalzira\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abEs mamprenen les obres a la muralla d\u2019Alzira\u00bb<\/span><\/a><\/p>\n","protected":false},"author":36,"featured_media":153569,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1632],"tags":[],"class_list":["post-153568","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-area-durbanisme-projectes-i-infraestructures"],"acf":[],"_links":{"self":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/153568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/comments?post=153568"}],"version-history":[{"count":1,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/153568\/revisions"}],"predecessor-version":[{"id":153571,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/153568\/revisions\/153571"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media\/153569"}],"wp:attachment":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media?parent=153568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/categories?post=153568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/tags?post=153568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}