{"id":148804,"date":"2024-04-09T11:57:49","date_gmt":"2024-04-09T09:57:49","guid":{"rendered":"https:\/\/alzira.es\/?p=148804"},"modified":"2024-04-09T12:48:10","modified_gmt":"2024-04-09T10:48:10","slug":"nova-installacio-fotovoltaica-al-sostre-del-ceip-pintor-andreu","status":"publish","type":"post","link":"https:\/\/alzira.es\/es\/nova-installacio-fotovoltaica-al-sostre-del-ceip-pintor-andreu\/","title":{"rendered":"Nova instal\u00b7laci\u00f3 fotovoltaica al sostre del CEIP Pintor Andreu"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1328\" height=\"798\" src=\"https:\/\/alzira.es\/wp-content\/uploads\/2024\/04\/andreu-2.jpg\" alt=\"\" class=\"wp-image-148819\" srcset=\"https:\/\/alzira.es\/wp-content\/uploads\/2024\/04\/andreu-2.jpg 1328w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/04\/andreu-2-680x409.jpg 680w, https:\/\/alzira.es\/wp-content\/uploads\/2024\/04\/andreu-2-768x461.jpg 768w\" sizes=\"(max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px\" \/><\/figure>\n\n\n\n<p>Alzira amplia el parc solar municipal amb la instal\u00b7laci\u00f3 de plaques que cobriran el 50% del consum energ\u00e8tic als CEIPs <strong>Pintor Teodoro Andreu<\/strong>, <strong>Llu\u00eds Vives<\/strong>, l\u2019escoleta infantil de la <strong><em>Muntanyeta<\/em><\/strong> i l\u2019escoleta infantil <strong><em>Infants<\/em><\/strong>. Al llarg d\u2019este mes d\u2019abril est\u00e0 previst que s\u2019inicien les obres.<\/p>\n\n\n\n<p>Es comptar\u00e0 amb una nova d\u2019instal\u00b7laci\u00f3 fotovoltaica per a autoconsum col\u00b7lectiu amb excedents sobre la \u00a0coberta del CEIP Pintor Teodor Andreu, amb un pressupost de 77.903,89 \u20ac. Es tracta d\u2019una ajuda reembossable bonificada en el seu tipus d\u2019inter\u00e9s combinada amb una subvenci\u00f3 a fons perdut del 50%. \u00c9s a dir que des de l\u2019IVACE se subvenciona el 50% i l\u2019altre 50% cal retornar-ho en terminis a 4 anys.<\/p>\n\n\n\n<p>El fet de ser una instal\u00b7laci\u00f3 d\u2019autoconsum col\u00b7lectiu, suposa que generar\u00e0 l\u2019energia des del CEIP Pintor Teodoro Andreu per\u00f2 subministrar\u00e0 l\u2019energia a este centre, al CEIP Llu\u00eds Vives, l\u2019escoleta Infantil La Muntanyeta i l\u2019escoleta Infantil Infants.<\/p>\n\n\n\n<p>Es disposaran 144 m\u00f2duls fotovoltaics amb una pot\u00e8ncia total de 65.52Kwp i es preveu una cobertura anual de la demanda del 52% amb un estalvi econ\u00f2mic brut anual de 11.761 \u20ac\/any.<\/p>\n\n\n\n<p>La creaci\u00f3 d\u2019instal\u00b7lacions d\u2019energia solar fotovoltaica suposa la generaci\u00f3 d\u2019energia el\u00e8ctrica neta, sense emissi\u00f3 de gasos d\u2019efecte d\u2019hivernacle, que respecta el medi ambient i contribu\u00efx a un desenvolupament sostenible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Alzira amplia el parc solar municipal amb la instal\u00b7laci\u00f3 de plaques que cobriran el 50% del consum energ\u00e8tic als CEIPs Pintor Teodoro Andreu, Llu\u00eds Vives, l\u2019escoleta infantil de la Muntanyeta i l\u2019escoleta infantil Infants. Al llarg d\u2019este mes d\u2019abril est\u00e0 previst que s\u2019inicien les obres. Es comptar\u00e0 amb una nova d\u2019instal\u00b7laci\u00f3 fotovoltaica per a autoconsum &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/alzira.es\/es\/nova-installacio-fotovoltaica-al-sostre-del-ceip-pintor-andreu\/\" class=\"more-link\">Continuar leyendo<span class=\"screen-reader-text\"> \u00abNova instal\u00b7laci\u00f3 fotovoltaica al sostre del CEIP Pintor Andreu\u00bb<\/span><\/a><\/p>\n","protected":false},"author":36,"featured_media":148813,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[5067],"tags":[5229],"class_list":["post-148804","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energies-sostenibles","tag-fotovoltaica"],"acf":[],"_links":{"self":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/148804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/users\/36"}],"replies":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/comments?post=148804"}],"version-history":[{"count":2,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/148804\/revisions"}],"predecessor-version":[{"id":148825,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/posts\/148804\/revisions\/148825"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media\/148813"}],"wp:attachment":[{"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/media?parent=148804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/categories?post=148804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alzira.es\/es\/wp-json\/wp\/v2\/tags?post=148804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}